Q-2, r. 35.5 - Regulation respecting landfill methane reclamation and destruction projects eligible for the issuance of offset credits

Full text
31. The operating status of reclamation or destruction devices must be monitored and recorded at least hourly, as follows:
(1)  for flares, by reading the thermocouple;
(2)  for other reclamation or destruction devices referred to in Appendix A, using a monitoring device to verify the operating status of the reclamation or destruction device.
Where methane is injected into a natural gas distribution network, or compressed or liquefied before being injected into a natural gas distribution network, the monitoring device used must be placed at the injection station of the natural gas distribution network.
M.O. 2021-06-11, s. 31.
In force: 2021-07-15
31. The operating status of reclamation or destruction devices must be monitored and recorded at least hourly, as follows:
(1)  for flares, by reading the thermocouple;
(2)  for other reclamation or destruction devices referred to in Appendix A, using a monitoring device to verify the operating status of the reclamation or destruction device.
Where methane is injected into a natural gas distribution network, or compressed or liquefied before being injected into a natural gas distribution network, the monitoring device used must be placed at the injection station of the natural gas distribution network.
M.O. 2021-06-11, s. 31.